Boeing announces delay to 787 first flight and deliveries
 Login/Join
 
one of us
Picture of TrapperP
posted
DATE:23/06/09
SOURCE:Flight International
Boeing announces delay to 787 first flight and deliveries
By Max Kingsley-Jones

Boeing has announced that it has postponed the maiden flight of the 787 after deciding to reinforce an area within the side-of-body section of the first Dreamliner.
The airframer says that the need was identified during the recent regularly scheduled tests on the full-scale static test airframe. It adds that "preliminary analysis indicated that flight test could proceed this month as planned. However, after further testing and consideration of possible modified flight-test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur."
Boeing says the 787 first flight - which was due to take place before the end of June - will be rescheduled along with the first delivery (due in quarter one 2010) following the final determination of the required modification and testing plan.



"It will be several weeks before the new schedule is available," says the airframer. "The 787 team will continue with other aspects of testing on Airplane No 1, including final gauntlet testing and low-speed taxiing. Work will also continue on the other five flight-test aircraft and the subsequent aircraft in the production system."
Boeing Commercial Airplanes chief executive Scott Carson says a team of experts has already identified several potential solutions. "Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localised area requiring reinforcement," he says.
"Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team," he adds.
A conference call involving Carson, Pat Shanahan, vice-president and general manager of airplane programmes, and Scott Fancher, vice-president and general manager of the 787 programme


Lord, give me patience 'cuz if you give me strength I'll need bail money!!
'TrapperP'
 
Posts: 3742 | Location: Moving on - Again! | Registered: 25 December 2003Reply With Quote
One of Us
Picture of JohnHunt
posted Hide Post
This pushes the first flight out at least a year.

It should be clear by now that carbon fiber as a material is simply not as well understood as they would like to think or us to.

I would be very hesitant to fly on this plane. Aluminum was a perfectly sound material and well proven.

Yes I know the air force has been flying the B2 for sometime, but look at its shape compared to the commercial aircraft. It is a single monolithic wing. Compare that to a tube with bits attached (like wings). We have Airbus carbon fiber bits falling off there tubes causing one and maybe two crashes. Now we have wings on Boeing planes about to fall off.

Carbon is great until it isn't. Then it is worthless.
 
Posts: 1678 | Registered: 16 November 2006Reply With Quote
  Powered by Social Strata  
 

Accuratereloading.com    The Accurate Reloading Forums    THE ACCURATE RELOADING.COM FORUMS  Hop To Forum Categories  Other Topics  Hop To Forums  Aviation    Boeing announces delay to 787 first flight and deliveries

Copyright December 1997-2023 Accuratereloading.com


Visit our on-line store for AR Memorabilia